The African Street Journal Tunisia
About

Tunisia calls for roadmap to recycle construction waste in roads

The government says future road projects could use 20 to 30% recycled material, while a trial on the RN3 tests durability.

Tunisia’s equipment minister, Salah Zouari, called on Friday 27 November 2026 for a rapid roadmap to collect, sort, treat and reuse demolition and construction waste in road infrastructure. The country has nearly 14 million tonnes of this waste, according to estimates cited by the minister.

A 1.2-kilometre trial section of national road No. 3 in Ben Arous was built with recycled material and reopened to traffic on 19 October. The trial is assessing its resistance and durability under real traffic conditions, as well as whether it meets quality and safety requirements.

Prime Minister Sarra Zaâfrani Zenzri said on 9 November that future road projects could include between 20 and 30% recycled material; those proportions are to be written into specifications for the projects concerned.

Why it mattersRoad agencies must assess the Ben Arous trial and write the proposed 20 to 30% share into specifications for covered projects.